The project
This office tower in Dubai’s Business Bay was completed in 2010 after four years under construction. It was opened more than six months later due to a delay in connecting the building to mains electricity.

Designed by US firm RUR, the building is the first project by developer H&H and provides 22 floors of office space, with a floor plate of some 6,000ft2. It is supported by a concrete facade which contains more than 1,300 individual holes and cuts cooling costs by up to 30%.

Story continues below
Advertisement

FEATURED COMMENT

Please click here to comment on this article

The site
The development is on the waterfront at Business Bay, opposite the currently empty site set aside for Zaha Hadid’s dancing tower project.

O14 is one of very few finished buildings in the area, which was hit particularly hard by the financial crisis. Infrastructure was a problem for the architect and the developer, and led to a delay in the opening of the project.

The concept
Developer Shahab Lutfi said that the key aspect of O14’s appeal was its uniqueness. “It is completely different. You drive through Dubai and you see glass buildings everywhere. This is the only building that doesn’t have glass on the outside,” he said.

RUR architect Jesse Reiser added: “The model was almost biological. It’s an exoskeleton, like bone. Instead of having the traditional curtain wall, the structure shades and building a also holds it up.”

Reiser said the ‘Swiss cheese’ moniker has stuck, although there have been other interpretations. “There are all kinds of names for it. The Russians say it is derived from Konstantin Melnikov’s house and others have said it’s indigenous Arabic architecture,” he said.




COMMENTS

Name *
Email *
City
Country
Subject: *
Comments: *
Math Question: *
Solve this simple math problem
and enter the result. E.g. for 1+3, enter 4.
Refresh the image if not clear
Remember me on this computer



NEWSLETTER SUBSCRIPTION
Email:



Arabian Supply Chain Middle East
Hotelier Middle East
Digital Production Middle East
Arabian Oil and Gas Middle East
Construction Week Online - India
Utilities middle east\
Hotelier India
LinkedIn
CWO dotcom

RELATED ARTICLES





Articles
Companies
ITP.com
Ahlan.ae Masala.ae Ahlanlive.com ArabianBusiness.com ArabianBusiness.com/Arabic ArabianBusiness.com/Jobs ArabianBusiness.com/Property ArabianOilandGas.com ArabianSupplyChain.com ArabianTravelDirectory.com ConstructionWeekOnline.com ConstructionWeekOnline.com DigitalProductionME.com Grazia.ae HotelierMiddleEast.com ITP.net TimeOutAbuDhabi.com TimeOutDubai.com TimeOutTickets.com Utilities-ME.com VivaMagazine.ae commsmea.com designmena.com