Middle East Construction News – Construction Week Online

Home / NEWS / Audio solution makes 'building in' easier


Audio solution makes 'building in' easier

by Selina Denman on Dec 16, 2009

  Be the first to comment
RSS Feeds Print this page

The FeOnic F Series drive.
The FeOnic F Series drive.

MindCo Middle East has launched a new technology capable of converting run-of-the-mill building materials into high-quality speakers.

The FeOnic F Series Drives are produced by the UK-based FeONIC Technology and are designed to provide consultants, engineers, interior designers and architects with a unique audio solution. The drives are small in size and can be easily integrated into commonplace structures such as tables, walls, ceilings, floors, doors or even bath tubs.

Once attached, the drives convert the surface into a speaker, creating superior music quality while ensuring that the source of audio output is completely hidden from view.

Story continues below
Advertisement

FEATURED COMMENT

Please click here to comment on this article

The technology can be used in combination with all commonly used resonant building materials, such as MDF, glass panels, plasterboards, plywood, metal sheet and structures, plastics, laminates, honeycomb panels, acrylic, fibreglass panels and wooden structures.

The drives have distributed output, rather than conical output, meaning that they create a larger area for the delivery of sound output. Importantly, FeONIC Technology also minimises noise pollution, offering near perfect distribution of sound with no reverberation, bounce or echo.

FeONIC drives are currently available in three models: the F4 Drive has a 20W output (100Hz-20KHz), the F 1.3 Drive has a 100W output (63 Hz – 20 KHz) and the S Drive is a sub-woofer drive (20Hz-200Hz). The product is suitable for high-end commercial spaces such as spas, restaurants, hotel rooms, bar counters, retail outlets and art galleries.

The solution is also cost effective, with one drive replacing up to five or six speakers. The product requires fewer man-hours during installation and involves lower maintenance costs.
 




COMMENTS

Name *
Email *
City
Country
Subject: *
Comments: *
Math Question: *
Solve this simple math problem
and enter the result. E.g. for 1+3, enter 4.
Refresh the image if not clear
Remember me on this computer



NEWSLETTER SUBSCRIPTION
Email:



Arabian Supply Chain Middle East
Hotelier Middle East
Digital Production Middle East
Arabian Oil and Gas Middle East
Construction Week Online - India
Utilities middle east\
Hotelier India
LinkedIn
CWO dotcom



Articles
Companies
ITP.com
Ahlan.ae Masala.ae Ahlanlive.com ArabianBusiness.com ArabianBusiness.com/Arabic ArabianBusiness.com/Jobs ArabianBusiness.com/Property ArabianOilandGas.com ArabianSupplyChain.com ArabianTravelDirectory.com ConstructionWeekOnline.com ConstructionWeekOnline.com DigitalProductionME.com Grazia.ae HotelierMiddleEast.com ITP.net TimeOutAbuDhabi.com TimeOutDubai.com TimeOutTickets.com Utilities-ME.com VivaMagazine.ae commsmea.com designmena.com