Middle East Construction News – Construction Week Online

Home / ANALYSIS / Maxxi


Maxxi

by Jeff Roberts on Dec 23, 2009

  Be the first to comment
RSS Feeds Print this page

MAXXI represents an attempt to bundle, twist and build mass in some places and reduce it in others
MAXXI represents an attempt to bundle, twist and build mass in some places and reduce it in others
[More Images]

FACT SHEET

Total site area 29,000 m²
Exterior spaces 19,640 m²
Interior spaces 21,200 m²
Exhibition spaces 10,000 m²
Facilities 6,000 m²
MAXXI Art 4,077 m²
MAXXI Architecture 1,935 m²
Total volume 113,000 m³
Maximum height 22.90 m

CONSTRUCTION DATA
Total Steel used for structure 6,700,000 kg
Concrete cast in-situ 50,000 m³
Total surface of fair-faced concrete 20,000 m²
Total surface area of glazing 2,600 m²
Total working hours 1,250,000

Cost EUR 150 million
Visitors forecast 200,000 – 400,000 per year

Works of art 350
Architectural drawings 75,000

Story continues below
Advertisement

FEATURED COMMENT

Please click here to comment on this article


Zumtobel’s Lighting Solution

“We want to use light to create worlds of experience, make work easier, improve communications and safety while being fully aware of our responsibility to the environment.”

Ever since the company was founded in 1950 by Dr. Walter Zumtobel, this vision has guided Zumtobel in developing innovative and individual lighting solutions. The objectives at the heart of this philosophy have always been the emotional effect of light within its architectural surroundings, people’s well-being, and energy- optimised use of light. Zumtobel generates unique customer benefit through the combination of technology, design, emotion and energy-efficiency.

The new MAXXI National Museum of the XXI Century Arts represented a target to develop a synergetic strategy in accordance with the development of internal (exposition galleries) and external design.

The target to provide a scenario with the right illumination throughout the day offered the chance to combine natural light with the integration of different lighting solutions. It was necessary to develop a solution which embraced solar shields and dimmable luminaries.

Zumtobel has been involved in the following Gulf projects:
Yas Island Marina Hotel (Abu Dhabi), Burj Dubai, Dubai Mall (Porsche Design, Paul Smith, G-Star, Swarovski Crystal), Atlantis Palm Hotel Dubai

Regional office contact (MENA):
Oliver Schwarz (Regional Manager)
info@zumtobeluae.ae
T:+971(0) 4299-3530
F: +971(0) 4299-3531




COMMENTS

Name *
Email *
City
Country
Subject: *
Comments: *
Math Question: *
Solve this simple math problem
and enter the result. E.g. for 1+3, enter 4.
Refresh the image if not clear
Remember me on this computer



NEWSLETTER SUBSCRIPTION
Email:



Arabian Supply Chain Middle East
Hotelier Middle East
Digital Production Middle East
Arabian Oil and Gas Middle East
Construction Week Online - India
Utilities middle east\
Hotelier India
LinkedIn
CWO dotcom



Articles
Companies
ITP.com
Ahlan.ae Masala.ae Ahlanlive.com ArabianBusiness.com ArabianBusiness.com/Arabic ArabianBusiness.com/Jobs ArabianBusiness.com/Property ArabianOilandGas.com ArabianSupplyChain.com ArabianTravelDirectory.com ConstructionWeekOnline.com ConstructionWeekOnline.com DigitalProductionME.com Grazia.ae HotelierMiddleEast.com ITP.net TimeOutAbuDhabi.com TimeOutDubai.com TimeOutTickets.com Utilities-ME.com VivaMagazine.ae commsmea.com designmena.com