Qatar - Bahrain CausewayLast Updated: Apr 17, 2011 |
|||
| Client | | | Public Works Authority (Qatar) \\\\\\\\ Ministry of Works (Bahrain) |
Actual Value: 3bn USD
Qatar - Bahrain Bridge |
| Contractors | | |
Main Contractor: Vinci Construction Main Contractor: Middle East Dredging Company - Medco (The dredging Works) Main Contractor: HOCHTIEF Construction AG Main Contractor: Consolidated Contractors Company W.L.L. Main Contractor: QDVC |
|
| Consultants | | |
Main Consultant: COWI Consult A/S (Pre-studies Consultant) Main Consultant: KBR (Project Manager) |
|
| Country | | | Qatar | |
| Category | | | Infrastructure | |
| Project Type | | | Roads Construction | |
| Project Duration | | | From: Q1 2010 Estimated To: Q3 2014 Estimated |
|
| Status | | | On Hold | |
| Scope | | | The Qatar - Bahrain causeway project calls for the design and construction of a 40 km two-lane dual carriageway motorway between Qatar and Bahrain. The road will run over a total of 18 km of embankments where the sea is shallow and 22 km of viaducts and bridges over deep water, including two 400 metre cable-stayed bridges over shipping channels. | |
| Schedule | | | The project is still on hold. | |
| Remark | | | The bridge will create a direct link between Qatar and Bahrain, promoting trade and travel between the two countries. At present, the journey by road takes five hours; with the causeway, it will only take about 30 minutes. The project will have to comply with stringent environmental standards and ecological requirements. QDVC is a Qatari subsidiary owned 51% by Qatari Diar and 49% by VINCI Construction Grands Projets. | |