Hydrogen Power Plant in Abu Dhabi

Last Updated: Feb 2, 2010

Client | Masdar  
Actual Value: 2.2bn USD
Masdar City.
Masdar City.
Consultants | Main Consultant: Foster Wheeler (Preliminary Engineering and Design)
 
Country | United Arab Emirates 
Category | Industrial 
Project Type |  
Project Duration | From:   Q1 2011 Estimated
To:        Q4 2014 Estimated
Status | Design  
Scope | The project calls for construction of hydrogen power plant. The plant would split natural gas into hydrogen and the greenhouse gas carbon dioxide (CO2). The hydrogen would fire a 500 megawatt power plant, while the CO2 would be injected into oilfields. The plant would be located in Shuweihat.  
Schedule | Foster Wheeler completed the preliminary engineering and design contract. The plant is expected to be completed in 2014.  
Remark |  



NEWSLETTER SUBSCRIPTION
Email:



Arabian Supply Chain Middle East
Hotelier Middle East
Digital Production Middle East
Arabian Oil and Gas Middle East
Construction Week Online - India
Utilities middle east\
Hotelier India
LinkedIn
CWO dotcom



Articles
Companies
ITP.com
Ahlan.ae Masala.ae Ahlanlive.com ArabianBusiness.com ArabianBusiness.com/Arabic ArabianBusiness.com/Jobs ArabianBusiness.com/Property ArabianOilandGas.com ArabianSupplyChain.com ArabianTravelDirectory.com ConstructionWeekOnline.com ConstructionWeekOnline.com DigitalProductionME.com Grazia.ae HotelierMiddleEast.com ITP.net TimeOutAbuDhabi.com TimeOutDubai.com TimeOutTickets.com Utilities-ME.com VivaMagazine.ae commsmea.com designmena.com