Built to inform

Sign up for the daily newsletters

No, Thank you

Big 5: Elematic to focus on hollow-core system

Designed to improve hollow-core slab production, Elematic’s FloorMES E9 system promises to optimise and balance contractors’ construction schedules

Elematic’s FloorMES E9 system is designed to enhance the manufacture of hollow-core slabs by optimising and balancing production plans and schedules.
Elematic’s FloorMES E9 system is designed to enhance the manufacture of hollow-core slabs by optimising and balancing production plans and schedules.

Elematic will use The Big 5 2016 as a platform to showcase FloorMES E9, a system designed to optimise hollow-core slab production.

The precast concrete plant and production line manufacturer’s latest automated system enhances the manufacture of hollow-core slabs by optimising and balancing production plans and schedules.

FloorMES E9 also actively monitors the work process and compares it to the original plan.

Jakko Salmenisvu, product director for Elematic, said: “An uninterrupted casting process is crucial to our customers.

“Accurate production and machinery data enables corrections to deviations before bottlenecks occur, while automated production, planning, and monitoring routines improve productivity,” he added.

The Big 5 2016 will take place at Dubai World Trade Centre (DWTC) from 21-24 November.

Most popular

Awards

The road to gender equality in Middle East construction
The story behind the CW Awards' Rising Star accolade, each of which has to date

Conferences

Leaders Kuwait 2018: New Kuwait 2035 needs smart city-led contracts
Localisation and contract modernisation are essential for Kuwait's diversification strategy
Construction Week's Leaders Kuwait 2018 summit opens
Speakers from Kuwait's Supreme Council for Planning and Development and CSCEC ME are at today's

Latest Issue

Construction Week - Issue 738
Apr 21, 2019