Built to inform

Sign up for the daily newsletters

No, Thank you

Big 5: Elematic to focus on hollow-core system

Designed to improve hollow-core slab production, Elematic’s FloorMES E9 system promises to optimise and balance contractors’ construction schedules

Elematic’s FloorMES E9 system is designed to enhance the manufacture of hollow-core slabs by optimising and balancing production plans and schedules.
Elematic’s FloorMES E9 system is designed to enhance the manufacture of hollow-core slabs by optimising and balancing production plans and schedules.

Elematic will use The Big 5 2016 as a platform to showcase FloorMES E9, a system designed to optimise hollow-core slab production.

The precast concrete plant and production line manufacturer’s latest automated system enhances the manufacture of hollow-core slabs by optimising and balancing production plans and schedules.

FloorMES E9 also actively monitors the work process and compares it to the original plan.

Jakko Salmenisvu, product director for Elematic, said: “An uninterrupted casting process is crucial to our customers.

“Accurate production and machinery data enables corrections to deviations before bottlenecks occur, while automated production, planning, and monitoring routines improve productivity,” he added.

The Big 5 2016 will take place at Dubai World Trade Centre (DWTC) from 21-24 November.

Most popular

Awards

Construction industry conversations around digitisation must evolve
The Middle East construction industry’s approach to tech must evolve and focus on how can

Conferences

CW In Focus | Inside the Leaders in KSA Awards 2019 in Riyadh
Meet the winners in all 10 categories and learn more about Vision 2030 in this
CW In Focus | Leaders in Construction Summit UAE 2019
A roundup of Construction Week's annual summit that was held in Dubai this September

Latest Issue

Construction Week - Issue 753
Nov 09, 2019