Built to inform

Sign up for the daily newsletters

No, Thank you

Abu Dhabi Airports receives Two Pearl Estidama ratings

Abu Dhabi Airports has received 2 Pearl rating from Estidama for its District Cooling Plant for the Midfield Terminal and the fire station at Sir Bani Yas Island Airport

Abu Dhabi airports received Two Pearl Estidama ratings [representation image only].
Abu Dhabi airports received Two Pearl Estidama ratings [representation image only].

Abu Dhabi Airports has received a Two Pearl rating from Estidama for the construction of its District Cooling Plant at the Midfield Terminal (MTB), and the fire station at Sir Bani Yas Island Airport.

The objective of the Pearl Building Rating System (PBRS) from Estidama, an initiative from the Department of Urban Planning and Municipalities, is to promote the development of sustainable buildings and improve quality of life.

The PBRS encourages water, energy, and waste minimisation, local material use and aims to improve supply chains for sustainable and recycled materials and products.

Estidama previously rated Abu Dhabi Airport’s Midfield Terminal Building as a Three Pearl rating for its design, the highest rated building of that size in the region, and the first airport building to receive such rating.

Abdul Majeed Al Khoori acting chief executive officer of Abu Dhabi Airports commented: “Every aspect of our buildings’ design, development and operations captures our commitment to sustainability and enhances the community’s understanding of our broader impacts as an organisation.

“It is important for us to uphold the leadership’s vision to achieve an environmentally-conscious emirate and a green way of life, so we will focus on embedding the Estidama principles into the core of our culture,” he said.

Completed earlier last year, MTB’s district cooling plant has a total capacity of 55,000 metric tons of refrigerant that will provide air conditioning for the MTB through 18 chillers and two thermal energy storage tanks.

It operates through a network of pipes that circulates chilled water responsible for the cooling effect.

The fire station at Sir Bani Yas is one of the primary elements for Sir Bani Yas Airport certification as an aerodrome, as per the GCAA requirements.

The fire station is manned 24/7 and equipped with two fire engines and high capacity supporting water tender, in line with the type of operations at the island.

“The efforts of our design and construction team continue to raise the bar on innovative, resource-efficient facilities that are essential to achieving our climate action goals,” concluded Al Khoori.

Most popular

Awards

Construction industry conversations around digitisation must evolve
The Middle East construction industry’s approach to tech must evolve and focus on how can

Conferences

CW In Focus | Inside the Leaders in KSA Awards 2019 in Riyadh
Meet the winners in all 10 categories and learn more about Vision 2030 in this
CW In Focus | Leaders in Construction Summit UAE 2019
A roundup of Construction Week's annual summit that was held in Dubai this September

Latest Issue

Construction Week - Issue 754
Nov 23, 2019