Error message

  • Warning: mysqli_connect(): php_network_getaddresses: getaddrinfo failed: Name or service not known in include() (line 276 of /var/www/www.monocodebase.com/htdocs/sites/default/settings/www.constructionweekonline.com.settings.php).
  • Warning: mysqli_connect(): (HY000/2002): php_network_getaddresses: getaddrinfo failed: Name or service not known in include() (line 276 of /var/www/www.monocodebase.com/htdocs/sites/default/settings/www.constructionweekonline.com.settings.php).
  • Warning: mysqli_close() expects parameter 1 to be mysqli, boolean given in include() (line 300 of /var/www/www.monocodebase.com/htdocs/sites/default/settings/www.constructionweekonline.com.settings.php).

Abu Dhabi’s Musanada completes 65% of $11m Al Falah project

Musanada's Al Falah internal roads and infrastructure development is due to be handed over later this year

Musanada has completed 65% of a roads and infrastructure development in the Al Falah area of Abu Dhabi [representational image].
Musanada has completed 65% of a roads and infrastructure development in the Al Falah area of Abu Dhabi [representational image].

Abu Dhabi General Services Company (Musanada) has completed 65% of an internal roads and infrastructure development in the Al Falah area of the UAE capital.

Valued at $11.4m (AED42m), the project is due to be handed over later this year.

The scope of work includes the refurbishment of the entrances to the Al Falah area, as well as the surrounding roads, through the construction of new pavements and an asphalt overlay.

A low-energy street lighting is also being installed, UAE state news agency, WAM, reported.

Saleh Al Mazrouei, acting roads and infrastructure executive director, said: "The $11.4m (AED42m) project aims to develop the road network surrounding the New Al Falah Villas area, in order to keep pace with the urban development and the expected growth in the traffic movement in the Al Falah area, by rehabilitating part of the existing entrances and improving the infrastructure of that area.

"Through this project, we will develop the existing road stretching on the eastern side from a dual one-lane to a dual three-lane road with a median, and will change the two existing roundabouts into intersections with traffic lights to facilitate smooth flow of traffic in line with the future development of the area.

“We will improve the road on the western side from a dual one-lane to a dual two-lane road in both directions, in addition to five entry and exit points to link the New Al Falah area to the roads surrounding Al Falah city," he added.

Most popular

Awards

CW Oman Awards 2020: Meet the winners
A round of the thirteen winning names at the Construction Week Oman Awards 2020 that

Conferences

Leaders UAE 2020: Building a sustainable, 'resilient' infra
AESG’s Phillipa Grant, Burohappold’s Farah Naz, and Samana's Imran Farooq on a sustainable built environment
CW In Focus | Inside the Leaders in KSA Awards 2019 in Riyadh
Meet the winners in all 10 categories and learn more about Vision 2030 in this

Latest Issue

Construction Week - Issue 767
Sep 01, 2020