BIG 5: Contractors urged to leave ducts hanging

New cable-locking system cuts construction time by 30%

Durodyne says its system replaces the traditional dust rods used in construction
Durodyne says its system replaces the traditional dust rods used in construction

Contractors looking to save on time and costs when erecting ducting systems have been urged to look to the new Dyna-tite cabling solution when hanging ducts.

“It replaces the traditional dust rods that are usually used in construction,” explained Caio Tadeu Brandao, director of international sales for Durodyne which produces the time-cutting device.

“An adjustable pin makes them easy to level and there’s no need for tools. The system can cut time by 30% and then there’s the issue of labour, where time is saved too.”

Dyna-tite has already proven popular throughout the USA, where Durodyne is based, and has also been adopted by the UK construction industries for prestigious projects, such as Wembley Stadium, the Emirates Stadium and Heathrow Airport.
 

Most popular

Awards

CW Oman Awards 2020: Meet the winners
A round of the thirteen winning names at the Construction Week Oman Awards 2020 that

Conferences

Leaders UAE 2020: Building a sustainable, 'resilient' infra
AESG’s Phillipa Grant, Burohappold’s Farah Naz, and Samana's Imran Farooq on a sustainable built environment
CW In Focus | Inside the Leaders in KSA Awards 2019 in Riyadh
Meet the winners in all 10 categories and learn more about Vision 2030 in this

Latest Issue

Construction Week - Issue 767
Sep 01, 2020