The Shis to Khorfakkan Road and Tunnels

The Shis to Khorfakkan Road and Tunnels

02 Oct 2013
Status: Construction
Project Duration:
From: Q1 2004 Estimated
To: Q1 2019 Estimated
Contractor:
Main Consultant
Consultant:
Main Contractor:
Halcrow Consulting Engineers & Architects Ltd.
Country: United Arab Emirates
City: Sharjah
Category: Roads Construction
Project Type: Mega Projects
Scope:
The project consists of a 23.2km dual carriageway road skirting the edge of the Omani border through mountainous terrain. The road also passes through five rock tunnels totalling 13km.
Schedule:
The lead consultant Halcrow is responsible for concept design and route selection, preliminary and detailed design of the road, rock tunnels and drainage culverts, detailed MEP design, all technical studies and assessments, value engineering and risk management, and construction supervision. Contractor General Mechanical has been assigned to tunnel 1 to undertake the tunnel excavation and support. The firm is currently excavating the portal area on the west side heading east using drill and blast techniques in the hard rock and mechanical excavators.
Remark:
Journey time is expected to be shortened by 30 minutes between Khorfakkan and Sharjah when complete in 2019, with the hope this will aid economic development within Sharjah as the link will further encourage the use of Khorfakkan port, bypassing the Straits of Hormuz.

Awards

Deadline approaches for CW Oman Awards 2020 in Muscat
You have until 20 January to submit your nominations for the ninth edition of the

Conferences

CW In Focus | Inside the Leaders in KSA Awards 2019 in Riyadh
Meet the winners in all 10 categories and learn more about Vision 2030 in this
CW In Focus | Leaders in Construction Summit UAE 2019
A roundup of Construction Week's annual summit that was held in Dubai this September