Built to inform

Sign up for the daily newsletters

No, Thank you

Abu Dhabi Waste Management Centre (Tadweer)

Tadweer reduces waste by 3.1% in 2019 in the emirate of Abu Dhabi
Tadweer collected 44,224.81 tonnes of construction and demolition waste, and 2,714.98 tonnes of used tyres
Abu Dhabi's Tadweer contains damage caused by rain, floods
Almost 4,000 Tadweer workers cleared 339 water-logged areas, including 171 in Abu Dhabi, 118 in
Tadweer's Abu Dhabi, Al Ain waste incinerators to begin ops in Q1'20
Work on the medical and hazardous waste incinerator project in Abu Dhabi is 80% complete,
Tadweer, GBCI ink MoU on zero waste management in Abu Dhabi
Zero Waste eliminates volume and toxicity of waste materials, and recovers resources instead of sending
Tadweer handles 8t of waste in Khalidiya during Jan-Sep 2019
Abu Dhabi Waste Management Centre's civic amenity collects 3.35t of plastic and 2.24t of paper
ZHO, Musanada, Tadweer ink MoU for people of determination
VIDEO: MoU signed to offer vocational training and operational rehabilitation with plastic recycling drive
Tadweer deploys smart tech to track waste contractors in Abu Dhabi
Smart facility opened to centrally control and monitor waste collection process and issue performance reports
Tadweer sanitises 338 schools in Abu Dhabi for new academic year
Details revealed of cleaning and pest control operations implemented at schools in Abu Dhabi City,

Most popular

Latest Issue

Construction Week - Issue 761
Mar 21, 2020